isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Refrigerant > < Mechanical Specifications|Page 5175
Page 2
background image

1. If installing a new receiver/drier, be sure to add 30 cc (1.0 fl.oz.) of new compressor oil to a new one.
2. Put the receiver/drier in the bracket and connect with the refrigerant line. Check that no excessive force is imposed on the line. Fasten the bracket

bolt to the receiver/drier.

3. Tighten the refrigerant line to the specified torque.

Torque: 6 N.m (52 lb.in)

4. O-rings cannot be reused. Always replace with new ones.
5. Be sure to apply new compressor oil to the O-rings when connecting the refrigerant line.

Refrigerant > < Mechanical Specifications|Page 5175