Rodeo Sport 2WD V6-3.2L (2001)
![background image](/isuzu/rodeo_sport_2wd/v6-3.2l/Page-894005.png)
-
The voltage displayed by the DVM may increase throughout the test as the fuel injector windings warm and the resistance of the fuel injector
windings changes.
-
An erratic voltage reading (large fluctuations in voltage that do not stabilize) indicates an intermittent connection within the fuel injector.
5. Injector Specifications:
7. The Fuel Injector Balance Test portion of this chart (Step 7 through Step 11) checks the mechanical (fuel delivery) portion of the fuel injector. An
engine cool-down period of 10 minutes is necessary in order to avoid irregular fuel pressure readings due to "Hot Soak" fuel boiling.