isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Shift Linkage, A/T > < Shift Solenoid, A/T|Specifications|Page 1769
Page 1
background image

Shift Solenoid: Testing and Inspection

SOLENOID VALVE TEST

1) Disconnect the connector from the Electronic Controlled Transmission (ECT) computer.
2) Measure the resistance between S1, S2, S3, S4 and ground.

Standard:  11 - 15 Ohms 

3) Apply battery voltage to the solenoid.

Check that an operation noise can be heard from the solenoid.

NOTE: If there is foreign material in the solenoid valve, there will be no fluid control even with solenoid operation.

INSPECTION OF SOLENOID

Using an ohmmeter, check the resistance between terminal and body.

Standard resistance:  11 - 15 Ohms 

Confirm that the solenoid operates when connecting the solenoid terminal to positive terminal of the battery, and solenoid body to negative
terminal.

Shift Linkage, A/T > < Shift Solenoid, A/T|Specifications|Page 1769