isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Maintenance - Timing Belt/Valve Clearance|Page 912 > < Maintenance - Timing Belt/Valve Clearance|Page 910
Page 10
background image

Figure 18

27.

After installing timing belt make sure that all the timing marks are still in their proper position and have not been disturbed during the tensioning
of the belt. (figure 18)

IMPORTANT: 

If you have resistance while rotating the engine by hand, do not continue. The valves may be contacting the pistons due to incorrect valve timing.
Recheck the camshafts and crankshafts sprockets to be sure they are correctly aligned with their marks. Serious engine damage could occur if the belt
is improperly installed.

28.

Remove the binding clips.

29.

Rotate crankshaft pulley a minimum of 2 complete turns (clockwise) and inspect if the timing marks have returned to the same position (# 2 Piston
on TDC). If it has returned to the same position then continue to Step 31. If there is resistance, please refer to the IMPORTANT note stated above.

30.

Proceed to the remaining reassembly procedure as outlined in the appropriate Workshop Manual.

Maintenance - Timing Belt/Valve Clearance|Page 912 > < Maintenance - Timing Belt/Valve Clearance|Page 910