isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Intake Air Plenum|Specifications|Page 2824 > < Intake Air Plenum|Specifications|Page 2822
Page 2
background image

INSTALLATION

1. Install common chamber and tighten bolts and nuts to the specified torque.

Torque: 

Bolt: 25 Nm (18 ft. lbs.)
Nut: 25 Nm (18 ft. lbs.)
 

2. Install fuel hose bracket and tighten bolts to specified torque.

Torque: 10 Nm (89 inch lbs.) 

3. Install exhaust gas recirculation valve assembly and tighten bolt and nut to the specified torque.

Torque: 25 Nm (18 ft. lbs.) 

4. Install throttle body and tighten bolts to the specified torque.

Torque: 25 Nm (18 ft. lbs.) 

5. Install ventilating hose to throttle valve and intake duct.
6. Connect vacuum hoses on canister VSV and positive crankcase ventilation hose. Tighten bolts for fuel rail assembly with pressure control valve

bracket. 

Torque: 25 Nm (18 ft. lbs.) 

7. Connect each connector without fail.
8. Connect vacuum booster hose.
9. Connect accelerator pedal cable. Accelerator pedal cable adjustment

1) Loosen the adjusting nut and screw cap. 
2) Pull outer cable while fully closing the throttle valve.
3) Tighten adjusting nut and lock nut temporarily.
4) Loosen adjusting nut by three turns and tighten lock nut.

Then manually operating the throttle valve, make sure that the valve lever returns up to the stopper screw.
If it does not reach the stopper screw, repeat from step 1.

Intake Air Plenum|Specifications|Page 2824 > < Intake Air Plenum|Specifications|Page 2822