isuzu Workshop Repair Guides

Isuzu Workshop Service and Repair Manuals

Suspension > < Steering|Specifications|Page 4950
Page 2
background image

6. Rod end, inner. Apply setting marks to ensure reassembly of the parts in their original position.

INSTALLATION 

1. Rod end, inner. Align the setting marks applied during disassembly.
2. Lock nut, inner. Torque to 118 Nm (87 ft. lbs.).

NOTE:  In either outer rod, the screw on the right side of the vehicle is threaded counterclockwise.

3. Rod end assembly, outer. Align the setting marks applied during disassembly.
4. Lock nut, outer. Torque to 118 Nm (87 ft. lbs.).
5. Nut and cotter pin, knuckle arm. Tighten the nut to the specified torque, with just enough additional torque to align cotter pin holes. Install new

cotter pin. Torque to 98 Nm (72 ft. lbs.).

6. Nut and cotter pin, center track rod. Tighten the nut to the specified torque, with just enough additional torque to align cotter pin holes. Install new

cotter pin. Torque to 98 Nm (72 ft. lbs.).

NOTE:  If replacing the track rod, adjust the new track rod length. Rod length to 328.3 mm (12.93 inches). Adjust the toe-in. 

Suspension > < Steering|Specifications|Page 4950