XJ (X350) V8-4.2L (2005)
03. Remove and fit new panel.
Fit and re-trim panel in reverse order.
On completion of panel replacement, the following checks should be carried out:
1. Panel gaps.
2. Hinge operation.
3. Lock alignment.
4. MET operation.