XJ (X350) V8-4.2L (2005)
![background image](/jaguar/xj_(x350)/v8-4.2l/Page-1588002.png)
03. Remove and fit new panel. Fit and re-trim panel in reverse order.
Torque settings:
-
Fender to Reinforcement -2 x 10 mm bolts 10 Nm.
04. On completion of panel replacement, the following checks should be carried out:
1. Panel gaps.
2. Hinge operation.
3. Lock alignment.
4. MET operation.