XK (X150) V8-4.2L (2008)
7. Remove and discard the O-ring seal.
Installation
1. Install a new O-ring seal.
2. Install the brake master cylinder.
> Tighten the nuts to 25 Nm (18 lb.ft).
3. Connect the brake master cylinder lines.
> Tighten the brake line unions to 17 Nm (13 lb.ft).
4. Install the plenum chamber panel.
> Tighten the bolts to 10 Nm (7 lb.ft).
5. Install the coolant expansion tank mounting bracket.
> Tighten the nuts to 10 Nm (7 lb.ft).
6. Remove the brake fluid reservoir.
7. Install the coolant expansion tank.