XKR Convertible (X100) V8-4.0L SC (AJ27) (2001)
12. Ensuring correct orientation, feed the front bow rail into the headlining, simultaneously threading tension cords and straps through the piping slits
onto the bow rail.
13. Align front bow rail to frame and secure with pop rivets.
14
Using a Piece of welding rod or Similar draw wire, pull the outer tension cords through the headlining piping.