XKR Convertible (X100) V8-4.0L SC (AJ27) (2001)
10. To prevent damage to headlining during fitting, apply protective tape to leading end of front bow rail.
11. Fit tension cords and straps to front bow rail.
-
Cut slits in front bow rail piping to accommodate the tension cords and straps.
-
Ensuring that tension cords and straps are not twisted, position them in the appropriate slits in the bow rail piping.
12. Ensuring correct orientation, feed the front bow rail into the headlining, simultaneously threading tension cords and straps through the piping slits
onto the bow rail.
13. Align front bow rail to frame and secure with pop rivets.
14. Using a piece of welding rod or similar draw wire, pull the outer tension cords through the headlining piping.
15. Position the outer tension cords to the frame and secure with pop rivets.