XKR Convertible (X100) V8-4.0L SC (AJ27) (2001)
14. Turn hydraulic pump valve fully clockwise to power operation position.
15. Connect ground cable to battery terminal.
16. Check hydraulic system for satisfactory operation and all connections for freedom from leaks.
1. Power top to fully raise position.
2. Power top to fully lowered position.
3. Power top to fully raised position.
4. Check hose connections for leakage.
17. CAUTION: Two fluid levels are marked on the pump reservoir body. The upper mark denotes the fluid level when the top is fully
lowered and the lower mark denotes the level when the top is fully raised.
NOTE: The convertible top hydraulic system is 'self-bleeding' and does not require further action to expel entrapped air.
Slacken and remove reservoir filler plug and remove and discard 'O' ring seal.
18. Check fluid level and top up as necessary.
19. Fit new 'O' ring seal to filler plug.
20. Fit and fully tighten filler plug on reservoir.
21. Remove protective cloth from trunk floor.
22. Fit RH liner to trunk.
23. Fit trunk rear finisher.
24. Fit trunk front liner.
25. Fit trunk floor carpet.
26. Fit battery cover.
27. Fit rear speaker assemblies.
28. Fit rear quarter casings.
29. Fit rear quarter casing cappings.
30. Fit rear seat squab.
31. Fit rear seat cushion.
32. Power adjacent front seat to original position.