XKR Convertible (X100) V8-4.0L SC (AJ27) (2001)
40. Withdraw hoses from retaining clips in fascia LH end fusebox aperture.
41. Route hoses from behind fascia to lower 'A' post.
42. Remove tape securing hoses to front of inner sill.
43. Lift edge of LH carpet for access, sever and remove tie straps securing hoses and release hoses from BIW clips.
44. Release hoses from spring clip at transmission tunnel and draw hoses under carpet to tunnel.