XKR Convertible (X100) V8-4.0L SC (AJ27) (2001)
2. Apply sealant to the eight joints on the engine face.
Sealant beads to be 3mm diameter and 12mm long. Cut the nozzle of the sealant tube to produce a 3mm bead. (Fit and tighten the securing bolts
within twenty minutes of sealant application)
3. Install the engine front cover.
Complete the tightening sequence.
Tighten to 11 - 13 Nm.
Vehicles with supercharger
1. Install the supercharger idler pulley and mount.
Tighten the retaining bolt.
Tighten the retaining bolts.
2. Attach the coolant hose.