XKR Coupe (X100) V8-4.0L SC (AJ27) (2000)
5. Mark bush position on sub-frame.
-
Stretch a length of thin cord across the center line of each bush location.
-
Below the string, place two pieces of masking tape diametrically opposite on the bore periphery.
-
Mark string position on the masking tape.
NOTE: New bushes are bonded in position using a rapid drying adhesive. Application of this adhesive and fitting of the bush must be completed
within 3 minutes. It is therefore strongly recommended that the procedure is rehearsed to ensure it can be completed within that period.
6. Position subframe on a hydraulic-press.
-
Position special tool 204-116-02 on press-bed, with recesses uppermost.
-
Position subframe on top of tool.