Commander 2WD V8-4.7L Flex Fuel (2009)
1. Carefully line-up the motor (1) with the chain drive gear and slide the motor assembly onto the drive unit assembly (2). Be certain the gears are
properly meshed.
2. Install the three motor retaining screws (3). Tighten the screws to 6 Nm (50 in. lbs.).
3. Insert the full open switch wire terminals (2) into the liftgate drive unit connector (1) ensuring the proper terminal location as noted in the motor
removal procedure.
4. Install the power liftgate drive unit assembly on the vehicle, See: Power Liftgate Drive Unit - Installation.
5. Connect the battery negative cable.
6. Using an appropriate scan tool, check and erase any power liftgate control module diagnostic trouble codes.
7. Perform the power liftgate learn cycle, See: Testing and Inspection/Programming and Relearning.
8. Verify power liftgate system operation.
Power Liftgate Link Rod - Removal
REMOVAL