Grand Cherokee 4WD L6-242 4.0L VIN S MFI (1993)
5.
Install the bronze bushing/retainer and tightening the screws to 5 Nm (45 in. lbs.).
6.
Slide the boot on to the torque shaft and apply multipurpose grease (MOPAR p/n 04318063 or equivalent) to the area that the bronze bushing will
contact.
7.
Install the torque shaft and seat the boot on the bushing retainer flange.
8.
Connect the transfer case shift linkage and adjust as necessary.
POLICY: Reimbursable within the provisions of the warranty.
TIME ALLOWANCE:
Labor Operation No:
21-03-10-90
0.6 Hrs.
FAILURE CODE:
P8 - New Part