kia Workshop Repair Guides

Kia Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 4760 > < Diagram Information and Instructions|Page 4758
Page 10
background image

3. Voltage Check Method

a. With each connector still connected, measure the voltage between the chassis ground and terminal 1 of each connectors (A), (B) and (C) as

shown in [FIG. 4].
The measured voltage of each connector is 5 V5 V and 0 V respectively. So the open circuit is between connector (C) and (B).

CHECK SHORT CIRCUIT

1. Test Method for Short to Ground Circuit

-

Continuity Check with Chassis Ground

If short to ground circuit occurs as shown in [FIG. 5], the broken point can be found by performing Step 2 (Continuity Check Method with Chassis
Ground).

2. Continuity Check Method (with Chassis Ground)

NOTE:  Lightly shake the wire harness above and below, or from side to side when measuring the resistance.

Specification (Resistance)
1 Ohm
 or less -> Short to Ground Circuit
1 MOhm or Higher -> Normal Circuit

Diagram Information and Instructions|Page 4760 > < Diagram Information and Instructions|Page 4758