Rondo V6-2.7L (2009)
![background image](/kia/rondo/v6-2.7l/Page-1604005.png)
CAUTION:
-
Be careful not to damage the both boots.
-
Keep clean without contamination on contacting point between the hub-bearing and BJ.
5. Install the ball joint assembly mounting bolt (A) to the knuckle.
Tightening torque Nm (kgf.m, lb-ft) :
98.1 - 117.7 (10 - 12, 72.3 - 86.8)
6. Install the washer (C), castle nut (B) and new split pin (A) to the front hub assembly.
Tightening torque Nm (kgf.m, lb-ft) :
196.1 - 274.6 (20 - 28, 144.7 - 202.5)
CAUTION:
The washer (C) should be assembled with convex surface outward when installing the castle nut (B) and split pin (A).
7. Install the wheel and the tire to the front hub.
Tightening torque Nm (kgf.m, lb-ft) :
88.3 - 107.9 (9 - 11, 65.1 - 79.6)