Sorento V6-3.5L (2004)
2. CHECKING SHEET
3. LOAD TEST
1. When discharging the battery during 15 seconds at half currency of Cold Cranking Power (CCP), the voltage of the battery should be as shown.
2. When the voltage is not within specification, repeat the load test again, and re-charge.
3. If the battery is left alone for 2 hours after re-charging and its output is over 12.5 V, and the voltage after a load test is over the standard value, the
battery can be used.
BATTERY VISUAL INSPECTION (2)
1. Make sure the ignition switch and all accessories are in the OFF position.
2. Disconnect the battery cables (negative first).
3. Remove the battery from the vehicle.