Workshop Manuals Factory service & repair Land Rover
01 300 TDi Diesel Engine Overhaul Manual02 INTRODUCTION03 DESCRIPTION AND OPERATION04 OVERHAUL05 DATA, TORQUE & TOOLS
Land Rover 300Tdi Engine04 · OVERHAUL
04 · General

Oil jet tubes - refit

Make
Land Rover
Model
Engines 300Tdi Engine
Section
CRANKSHAFT, CAMSHAFT, PISTONS AND CYLINDER BLOCK › Oil jet tubes - refit
OVERHAULOil jet tubes - refit
Oil jet tubes - refit – Land Rover 300Tdi Engine

ENGINE

72

OVERHAUL

Pistons and connecting rods - refit

1. Position piston ring gaps at 60

°

to each other

and away from thrust side of piston (left hand
side of piston when viewed from front).

2. Slide suitable lengths of tubing over connecting

rod bolts.

3. Ensure cylinder bores are clean.
4. Lubricate pistons, rings and cylinder bores with

engine oil.

5. Compress piston rings using a suitable clamp.
6. Insert piston and connecting rod into cylinder

bore ensuring that piston is in its correct fitted
order and arrow on piston crown is towards
front of cylinder block.

7. Push piston into cylinder bore.

CAUTION: Ensure that connecting rods do
not contact cylinder bores. Do not pull
connecting rods fully down cylinder bores

at this stage.

8. Repeat above procedures for numbers 2 and 3

pistons and connecting rods.

Oil jet tubes - refit

1. Position sealing washers in cylinder block.
2. Fit oil jet tubes to their original locations.
3. Fit banjo bolts and washers, tighten bolts to 17

Nm.

Parts & tools for this job For Land Rover Engines

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.