landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Cylinder head - overhaul > < Gasket - cylinder head|Page 276
Page 231
background image

ENGINE - V8

12-2-88 OVERHAUL

4. Fit LRT-12-223/4 and LRT-12-223/3 to rear of 

LH camshafts and tighten bolt securing tools.

5. Fit LRT-12-223/5LRT-12-223/6 to LH cylinder 

head and tighten LRT-12-223/6 into spark plug 
thread.

6. Rotate engine crankshaft pulley clockwise to 

align TDC timing mark.

NOTE: Raise timing chain and hold under 
tension while turning crankshaft pulley.

7. Position LRT-12-227 through timing tool 

access hole and secure flywheel in TDC 
position.

8. Fit LH VCC unit.

 

 + 

 Engine - V8, OVERHAUL, Variable 

camshaft unit - variable camshaft control 
(VCC).

9. Fit coolant pump to coolant manifold pipes.

 

 + 

 Engine - V8, OVERHAUL, Pipe(s) - 

water pump to coolant manifold.

10. Clean exhaust manifold mating faces and fit 

new gaskets.

11. Apply copper grease to exhaust manifold studs, 

fit exhaust manifold, fit 8 new nuts securing 
exhaust manifold and tighten to 23 Nm (17 
lbf.ft).

Cylinder head - overhaul > < Gasket - cylinder head|Page 276