landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Crankcase Vent Oil Separator Removal|Page 1520 > < Crankcase Vent Oil Separator Removal|Page 1518
Page 6
background image

 

 

 

 

 

 

 

 

 

 

 

 

  

Stage 3: Tighten the high-pressure fuel supply line union at the fuel pump to 30 Nm (22 
lb.ft). 

  

Stage 4: Tighten the high-pressure fuel supply line union at the fuel injection diverter rail to 
30 Nm (22 lb.ft). 

8 . 

  Connect the low-pressure fuel lines. 

  

Remove the blanking caps from the ports.

9 . 

  Connect the glow plug electrical connectors.

10 . 

  Install the breather pipes.

11 . 

  Install the oil filter element. 

  

Clean the components. 

  

Install a new O-ring seal. 

  

Tighten the oil filter element cover to 25 Nm (18 lb.ft).

12 . 

  Connect the EOP sensor electrical connector.

13 . 

  Install the EGR coolant cross-over pipe.

  

Install the two retaining bolts. 

  

Tighten to 13 Nm (10 lb.ft). 

14 . 

  Connect both EGR coolant cross-over pipe hoses.

  

Remove the EGR coolant hose clamps. 

15 . 

  Connect the low-pressure fuel lines. 

  

Remove the blanking caps from the ports.

16 . 

  

Install the intake air shutoff throttle. For additional information, refer to 

Intake Air Shutoff Throttle 

(19.70.32)

 (Section 303-04) 

17 . 

  

Connect the battery ground cable. For additional information, refer to 

Specifications

 (Section 414-

00) 

18 . 

  Check and top-up the engine oil.

Crankcase Vent Oil Separator Removal|Page 1520 > < Crankcase Vent Oil Separator Removal|Page 1518