Range Rover (LM) V8-4.4L (2009)
3. Install the halfshaft support bearing housing.
^
Install a new O-ring seal.
^
Lubricate the O-ring seal with petroleum jelly.
^
Tighten the bolts evenly to 25 Nm (18 ft. lbs.).
4. RH side: Attach the wiring harness.
^
Secure the clips.
5. LH side: Attach the wiring harness.
^
Secure the clips.
6. Install the power steering pump and bracket.
^
Tighten the bolts to 25 Nm (18 ft. lbs.).
7. Install the engine front cover.
8. Install the engine.
9. Connect the battery ground cable.