Range Rover (LM) V8-4.4L (2009)
6. Install the generator.
^
Install and tighten the generator upper fixing bolt, before the lower bolts.
^
Tighten the 3 bolts to 48 Nm (35 ft. lbs.).
7. Install the battery positive cable.
^
Connect the battery positive cable.
^
Tighten the nut to 10 Nm (7 ft. lbs.).
^
Connect the generator electrical connector.
8. Install the coolant pump pulley.
^
Tighten the bolts to 10 Nm (7 ft. lbs.).
9. Install the accessory drive belt idler pulley.
^
Tighten the bolt to 25 Nm (18 ft. lbs.).
10. Install the A/C compressor and the A/C compressor mounting bracket.
^
If a new compressor is being installed, the required amount of refrigerant oil must be drained from it.
11. Secure the A/C compressor mounting bracket.
^
Tighten the bolts to 25 Nm (18 ft. lbs.).
12. Secure the A/C compressor.
^
Tighten the bolts to 25 Nm (18 ft. lbs.).
13. Connect the A/C clutch electrical connector.
CAUTION: Lubricate the new seals with clean refrigerant oil.
14. Connect the refrigerant lines.
^
Clean the component mating faces.
^
Install the new O-ring seals.
^
Tighten the bolts to 10 Nm (7 ft. lbs.).
15. Secure the transmission cooler pipes into clips.
16. Install the power steering pump.
^
Tighten the bolts to 25 Nm (18 ft. lbs.).
17. Connect the high pressure line.
^
Clean the component mating faces.
^
Install the new O-ring seals.
^
Tighten the union to 25 Nm (18 ft. lbs.).
18. Connect the low pressure line.
^
Clean the component mating faces.
^
Secure with the clip.
19. Clean all the crankshaft pulley mating faces.
20. Using the special tools, install the crankshaft front seal.
^
Lubricate the seal with clean engine oil.
^
Use the discarded crankshaft bolt with the service tool.
21. Install the front wheel.
^
Tighten the wheel nuts to 140 Nm (103 ft. lbs.).