Range Rover (LM) V8-4.4L (2009)
18. Remove the ignition switch mounting bracket.
^
Remove the 3 screws.
19. Remove the instrument panel ducting.
^
Remove the 14 screws.
Installation
1. Install the instrument panel ducting.
^
Install the 14 screws.
2. Install the ignition switch mounting bracket.
^
Install the 3 screws.
3. Install the instrument panel center reinforcement.
^
Install the 6 screws.
4. Install the sunload sensor.
CAUTION: Make sure that the wiring harnesses are correctly routed.
5. With assistance, install the instrument panel reinforcement.
^
Secure the instrument cluster wiring harness clip.
^
Secure the ICP wiring harness clip.
^
Connect the sunload sensor electrical connector.
6. Secure the instrument panel reinforcement.
^
Install the screws.
7. Connect and secure the rear blower motor wiring harness electrical connector.
8. Install the driver side footwell duct.
^
Install the 2 screws.
9. Install the floor console.
10. Install the climate controlled seat switch.
11. Install the steering column extension gaiter.
^
Secure in the 4 clips.
12. Install the clockspring.
13. Secure the ignition switch to the ignition switch mounting bracket.
^
Install the 2 screws.
14. Install the transponder coil.
^
Connect the electrical connector.