Range Rover (LM) V8-4.4L (2009)
-
Disconnect the CJB battery positive cable.
-
Reposition the battery positive cable for access.
Installation
1. Install the CJB.
-
Connect the CJB battery positive cable.
-
Tighten the nut to 15 Nm (11 lb.ft).
-
Install the CJB upper access cover.
2. Connect the CJB electrical connectors.
3. Secure the CJB.
-
Install the screws.
4. Install the CJB battery positive cables.
-
Connect the CJB battery positive cables to the previously marked positions.
-
Tighten the nuts to 8 Nm (6 lb.ft).
5. Install the CJB lower access cover.
6. Install the audio unit.
7. Connect the battery ground cable.