landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Power Distribution Relay > < Central Junction Box (CJB)|Page 4709
Page 1
background image

Fuse Block: Service and Repair
Engine Junction Box (EJB)

Engine Junction Box (EJB)

Removal

1. Disconnect the battery ground cable.
2. Remove the engine control module (ECM) cover.

-

Remove the 10 screws.

3. Remove the engine junction box (EJB).

-

Disconnect the 4 electrical connectors.

-

Release the EJB positive battery cable.

-

Remove the 2 nuts.

CAUTION:  Note the fitted position of the component prior to removal.

NOTE:  Do not disassemble further if the component is removed for access only.

4. Remove the 5 relays.

Installation

1. Install the relays.
2. Install the EJB.

-

Tighten the nuts to 8 Nm (6 lb.ft).

-

Secure the EJB positive battery cable.

-

Connect the electrical connectors.

3. Install the ECM cover.

-

Tighten the screws to 2 Nm (1 lb.ft).

4. Connect the battery ground cable.

Power Distribution Relay > < Central Junction Box (CJB)|Page 4709