landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Brake Fluid Accumulator|Testing and Inspection|Page 6319 > < Brake Fluid Accumulator|Testing and Inspection
Page 2
background image

6. Pressure will rapidly rise to the accumulator precharge value, point X, at which point rate of increase will reduce as pressure rises to system

pressure of approximately 170 bar - see graph 'A'.

7. With a new accumulator, point 'X' will occur at 80 bar.
8. Renew accumulator if point 'X' occurs below 50 bar.
9. Depressurize system. Remove test equipment.

10. Using new sealing washers, position high pressure hose to pump. Secure with banjo bolt. Tighten to 24 Nm (18 ft. lbs.) 
11. Align pump/motor assembly to mounting. Secure with nuts. Tighten to 8 Nm (6 ft. lbs.) 
12. Bleed brake system.

Brake Fluid Accumulator|Testing and Inspection|Page 6319 > < Brake Fluid Accumulator|Testing and Inspection