Repair Procedure
Fig. 4
1.
Remove original exhaust pipe support No. 4 then loosen nuts (as indicated by arrows in figure 4) to turn the flange of the tail pipe.
Fig. 5
2.
Reposition muffler assembly by pulling down tail pipe assembly (as shown by large arrow in figure 5). While holding tail pipe down, retighten
nuts as indicated by two arrows.
Torque: 41 ft lbs (56.Nm, 570 Kgf.cm)
Fig. 6
3.
Loosen nuts attaching center exhaust pipe to front exhaust pipe (indicated by arrows in figure 6). Reposition center pipe by turning
counterclockwise as shown. While holding pipe in position, retighten nuts.
Torque: 41 ft.lbs (56.Nm, 570 Kgf.cm)
4.
Install new exhaust pipe support No.4, (P/N 17565-11160).