ES 350 V6-3.5L (2GR-FE) (2007)
a. Install the ECM bracket with the 4 screws.
Torque: 3.0 N.m (31 kgf.cm, 27 in.lbf)
b. Connect the 2 ECM connectors.
NOTE: When connecting the connector, make sure that dirt, water and other foreign matter do not become stuck between the connector and
other parts.
1. Connect the 2 ECM connectors and lower the 2 levers.
NOTE: Make sure that the 2 levers are securely lowered.
c. Install the ECM with the 3 nuts.
Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)
2. INSTALL FRONT SUSPENSION UPPER CENTER BRACE
3. INSTALL ENGINE ROOM SIDE COVER LH
4. INSTALL ENGINE ROOM SIDE COVER RH
5. INSTALL COOL AIR INTAKE DUCT SEAL
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
7. PERFORM INITIALIZATION
a. Perform initialization procedure.