ES 350 V6-3.5L (2GR-FE) (2007)
SMART (Part 1)
SMART (Part 2)
2. ACTIVE TEST
(a)
Connect the intelligent tester to the DLC3.
HINT: Performing the ACTIVE TEST is one of the methods to save diagnostic time. It is possible to display the DATA LIST during the
ACTIVE TEST.