GS 350 AWD V6-3.5L (2GR-FSE) (2009)
(e) Turn the control shaft lever counterclockwise until it stops, and turn it clockwise 2 notches to set it to the N position.
(f) Remove the transmission control shaft lever.
(g) Align the neutral basic line with the switch groove, and tighten the adjusting bolt.
Torque: 13 Nm (133 kgf-cm, 9 ft-lbf)
(h) Using a screwdriver, bend the tabs of the lock washer.
HINT: Bend at least 2 of the lock washer tabs.
(i) Install the transmission control shaft lever with the nut.
Torque: 16 Nm (163 kgf-cm, 12 ft-lbf)
(j) Connect the park/neutral position switch connector.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
3. ADJUST SHIFT LEVER POSITION See: Transmission and Drivetrain/Automatic Transmission/Transaxle/Shifter A/T/Adjustments/A760E
Automatic Transmission
4. INSPECT SHIFT LEVER POSITION See: Transmission and Drivetrain/Automatic Transmission/Transaxle/Shifter A/T/Testing and
Inspection/A760E Automatic Transmission/On-Vehicle Inspection
5. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY See: Testing and Inspection/A760E Automatic Transmission/On-Vehicle
Inspection
6. INSTALL NO. 2 ENGINE UNDER COVER
7. PERFORM INITIALIZATION
(a) Perform initialization See: Testing and Inspection/Programming and Relearning.
NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.