GS 350 AWD V6-3.5L (2GR-FSE) (2009)
(b) Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, and check operation of
the valve.
NOTE:
While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may
occur.
OK:
The solenoid makes an operating sound.
3. INSPECT SHIFT SOLENOID VALVE (S2)
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
(b) Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, and check operation of
the valve.
NOTE:
While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may
occur.
OK:
The solenoid makes an operating sound.
4. INSPECT SHIFT SOLENOID VALVE (S3)
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
(b) Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, and check operation of
the valve.
NOTE:
While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may
occur.
OK:
The solenoid makes an operating sound.