GS 350 RWD V6-3.5L (2GR-FSE) (2007)
c. Connect the camshaft timing oil control valve connector.
d. Install the V-bank cover bracket with the bolt.
Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)
4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Exhaust Side of Bank 1)
a. Apply a light coat of engine oil to a new O-ring and install it to the oil control valve.
b. Install the oil control valve with the bolt.
Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)
NOTE: Be careful that the O-ring is not cracked or jumped when installing the oil control valve.
c. Connect the camshaft timing oil control valve connector.