GS 350 RWD V6-3.5L (2GR-FSE) (2007)
18. INSPECT FOR COOLANT LEAK
19. INSPECT FOR FUEL LEAK
20. INSTALL V-BANK COVER SUB-ASSEMBLY
21. INSTALL ENGINE ROOM SIDE COVER LH
22. INSTALL ENGINE ROOM SIDE COVER RH
23. INSTALL COOL AIR INTAKE DUCT SEAL
24. CHECK FUNCTION OF THROTTLE BODY WITH MOTOR ASSEMBLY
25. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable to the negative (-) battery terminal.