GS 350 RWD V6-3.5L (2GR-FSE) (2007)
NOTE: Connect the connector securely.
2. INSTALL NO. 1 ENGINE COVER
a. Install the cover with the 2 cap nuts and clip.
3. INSTALL NO. 1 AIR CLEANER INLET
a. Install the No. 1 air cleaner inlet with the bolt.
Torque: 5.0 N.m (51 kgf.cm, 44 in.lbf)
4. INSTALL COOL AIR INTAKE DUCT SEAL
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
6. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.