GS 350 RWD V6-3.5L (2GR-FSE) (2007)
16. INSTALL INSTRUMENT PANEL FINISH PANEL END LH
17. INSTALL INSTRUMENT PANEL FINISH PANEL END RH
18. INSTALL CONSOLE UPPER PANEL ASSEMBLY
19. INSTALL FRONT CONSOLE UPPER PANEL GARNISH
20. CONNECT NO. 2 RELAY BLOCK
a. Connect the No. 2 relay block with the bolt and nut.
Torque: 12 N.m (125 kgf.cm, 10 ft.lbf)
21. INSTALL V-BANK COVER
22. INSTALL ENGINE ROOM SIDE COVER RH
23. INSTALL ENGINE ROOM SIDE COVER LH
24. INSTALL COOL AIR INTAKE DUCT SEAL
25. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.