GS 350 RWD V6-3.5L (2GR-FSE) (2007)
SMART ACCESS
2. ACTIVE TEST
HINT:
Performing the active test is one of the methods to shorten labor time. It is possible to display the data list during the active test.
(a)
Connect the intelligent tester to the DLC3.
(b) Turn the engine switch on (IG) and turn the intelligent tester on.
(c)
Following the display on the intelligent tester, perform the active test.
BODY
Pinout Values and Diagnostic Parameters
TERMINALS OF ECU
1. STEERING LOCK ACTUATOR ASSEMBLY (STEERING LOCK ECU)