GS 350 RWD V6-3.5L (2GR-FSE) (2007)
INSTALLATION
1. INSTALL FRONT ACTIVE STABILIZER CONTROL ECU
a. Connect the ECU connector.
HINT: Connect the connector before installing the ECU.
b. Install the ECU with the bolt and 2 nuts.
Torque:
7.0 N.m (71 kgf.cm, 62 in.lbf) for nut
9.0 N.m (92 kgf.cm, 80 in.lbf) for bolt
c. Using the procedures given, connect the ECU connectors.
1. Connect the ECU connector(*1).
2. Rotate the lever in the direction of the arrow until a "click" sound is heard(*2).
3. Lock the lever's lock(*3).
d. Install the 2 ground wires to the ECU with the 2 bolts.
Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)
e. Connect the wire harness clamp to the bracket.
2. INSTALL NO. 2 COOL AIR INTAKE DUCT