lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Shift Solenoid, A/T|Locations|Page 6035 > < Shift Solenoid, A/T|Locations|Page 6033
Page 1
background image

Shift Solenoid: Testing and Inspection

SHIFT SOLENOID VALVE 

INSPECTION 

1. INSPECT SHIFT SOLENOID VALVE (SL1)

(a)

Measure the resistance according to the value(s) in the table.

Standard resistance

(b) Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, and

check operation of the valve.

NOTICE: While using the battery during inspection, do not bring the positive and negative tester probes too close to each other as a short
circuit may occur.

OK: The solenoid makes an operating sound.

2. INSPECT SHIFT SOLENOID VALVE (S1)

(a)

Measure the resistance according to the value(s) in the table.

Shift Solenoid, A/T|Locations|Page 6035 > < Shift Solenoid, A/T|Locations|Page 6033