GS 350 RWD V6-3.5L (2GR-FSE) (2007)
8. INSTALL SHIFT SOLENOID VALVE (SLU)
(a)
Install the shift solenoid valve.
9. INSTALL SHIFT SOLENOID VALVE (SL2)
(a)
Install the shift solenoid valve.
(b) Install the 2 straight pins and the lock plate with the bolt.
Torque: 6.4 N*m (65 kgf*cm, 57 in.*lbf)
INSTALLATION
1. INSTALL TRANSMISSION VALVE BODY ASSEMBLY
(a)
Install the check ball body and spring.
NOTICE: Do not drop the check ball body and spring.
(b) Check the accumulator pistons, check ball body and spring as shown in the illustration.