GS 450h V6-3.5L (2GR-FSE) Hybrid (2007)
d. Install the 4 clamps and connect the connector to connect the wire harness.
7. INSTALL AIR OUTLET CONTROL SERVO MOTOR RH
a. Install the servo motor with the 3 screws.
b. Connect the connector.
8. INSTALL COOLER EXPANSION VALVE
a. Install the cooler expansion valve to the cooler evaporator.
9. INSTALL AIR CONDITIONING TUBE ASSEMBLY
a. Sufficiently apply compressor oil to 2 new O-rings and the fitting surface of the A/C tube.
Compressor oil: ND-OIL 11 or equivalent
b. Install the 2 O-rings on the A/C tube.
c. Using a 4 mm hexagon wrench, install the A/C tube with the 2 hexagon bolts.