lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Hybrid Battery Control|Page 3314 > < Hybrid Battery Control|Page 3312
Page 9
background image

CAUTION:  Wear insulating gloves.

NOTE:
-

Tightening bolts A and B in a wrong order may cause the cable and the inverter with converter to break.

-

Make sure that the tightening torque is between 6.4 and 9.6 N.m (65 and 98 kgf.cm, 57 and 85 in.lbf).

c. Install the inverter motor cable bracket with the 2 nuts (C).

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)

NOTE:  Make sure that the tightening torque is between 6.4 and 9.6 N.m (65 and 98 kgf.cm, 57 and 85 in.lbf).

7. CONNECT GENERATOR CABLE

a. Connect the generator cable. Tighten bolt B and insert the generator cable into the inverter with converter.

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)

CAUTION:  Wear insulating gloves.

NOTE:
-

Tightening bolts A and B in a wrong order may cause the cable and the inverter with converter to break.

-

Make sure that the tightening torque is between 6.4 and 9.6 N.m (65 and 98 kgf.cm, 57 and 85 in.lbf).

b. Fix the generator cable to the inverter with converter assembly with the 2 bolts (A).

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)

CAUTION:  Wear insulating gloves.

NOTE:
-

Tightening bolts A and B in a wrong order may cause the cable and the inverter with converter to break.

-

Make sure that the tightening torque is between 6.4 and 9.6 N.m (65 and 98 kgf.cm, 57 and 85 in.lbf).

8. INSTALL CONNECTOR COVER ASSEMBLY

a. Install the connector cover assembly with the 2 bolts.

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)

Hybrid Battery Control|Page 3314 > < Hybrid Battery Control|Page 3312