GS 450h V6-3.5L (2GR-FSE) Hybrid (2007)
b. Install the canister with the 4 nuts.
Torque: 14.7 N.m (150 kgf.cm, 11 ft.lbf)
c. Connect the air inlet line tube and vent line tube.
1. Push the tubes into the port and push the retainer to lock it.
NOTE:
-
Check for damage or foreign objects on the connected part.
-
After connecting, check that the vent hose and the valve are securely connected by pulling on them.
d. Connect the purge line hose.
e. Connect the connector and attach the 2 clamps.
2. INSTALL FLOOR UNDER COVER