GS 450h V6-3.5L (2GR-FSE) Hybrid (2007)
10. CHECK FOR LEAKAGE OF REFRIGERANT
11. INSTALL REAR ENGINE UNDER COVER LH
12. INSTALL ENGINE UNDER COVER
13. INSTALL NO. 1 AIR CLEANER INLET
14. INSTALL V-BANK COVER
15. REMOVE COOL AIR INTAKE DUCT SEAL
16. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.