GS 450h V6-3.5L (2GR-FSE) Hybrid (2007)
1. INSTALL POWER STEERING ECU
(a)
Connect the 2 power steering ECU connectors and securely lock the connectors.
(b) Install the power steering ECU to the battery tray with the 2 bolts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
(c)
Install the ground cable terminal with bolt (A).
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
(d) Install the No. 1 battery tray support.
2. INSTALL INVERTER WITH CONVERTER ASSEMBLY
(a)
Install the inverter with converter.
3. PERFORM INITIALIZATION
(a)
Perform initialization.
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
4. INITIALIZE ROTATION ANGLE SENSOR AND CALIBRATE TORQUE SENSOR ZERO POINT
(a)
Initialize the rotation angle sensor and calibrate torque sensor zero point.