GS 450h V6-3.5L (2GR-FSE) Hybrid (2007)
8. INSTALL SHIFT POSITION INDICATOR
(a)
Install the shift position indicator to the console panel UPR assembly with the 2 screws.
HINT:
Engage the 3 claws to install the indicator.
(b) Connect the indicator light wire harness connector and the wire harness to the console panel UPR assembly.
INSTALLATION
1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
(a)
Install the floor shift assembly with the 4 bolts.
NOTICE:
Do not allow the wire harness to get caught between the parts.
Torque: 8.3 N*m (85 kgf*cm, 74 in.*lbf)
(b) Connect the 6 clamps to the floor shift assembly.