GS 450h V6-3.5L (2GR-FSE) Hybrid (2007)
(b) Apply MP grease to the shaded area of the shift lever guide housing as indicated in the illustration.
(c)
Install the shift lever guide housing with the shift lever lock pin and a new shift lever nut.
NOTICE:
^
Install the shift lever nut and lock pin after first engaging the 2 claws.
^
Securely engage the claws.
(d) Connect the transmission control switch connector to the floor shift assembly.
2. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
3. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
4. INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR
5. INSTALL FRONT FLOOR COVER CENTER RH
(a)
Install the front floor cover center RH with the 3 grommets.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
6. INSTALL FRONT EXHAUST PIPE ASSEMBLY