GS 460 V8-4.6L (1UR-FSE) (2008)
Main Relay (Computer/Fuel System): Service and Repair
Installation
1UR-FSE ENGINE CONTROL SYSTEM: INTEGRATION RELAY: INSTALLATION
1. INSTALL INTEGRATION RELAY
(a) Connect the 3 connectors.
(b) Attach the integration relay to the engine room No. 2 relay block.
(c) Install the engine engine room No. 1 relay block cover.
2. INSTALL ENGINE ROOM SIDE COVER LH See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
3. INSTALL COOL AIR INTAKE DUCT SEAL See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and Inspection/Programming and
Relearning/Steering Initialization.